Montmorency County is a County Enforcing Agency for Soil Erosion and Sedimentation Control under Part 91 of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended.
The County's SESC program regulates certain earth changes to protect Michigan's land and water resources from soil erosion and sedimentation.
Do I need a permit?
A Soil Erosion and Sedimentation Control permit is generally required for an earth change that disturbs one or more acres of land or is within 500 feet of a lake or stream. Projects may include new homes, additions, accessory buildings, shoreline work, commercial development, mining operations, utilities, and other regulated earth changes. If you are unsure whether your project requires a permit, contact the Soil Erosion Officer before beginning work. Joseph Stone Soil Erosion Officer (989) 785-8006
Blank residential/minor project site plan worksheet
Project timing worksheet
Landowner authorization
Current fee schedule
Current Fee Schedule View the current fees for residential, commercial, mining, utility, violation, and renewal permits. The current fee schedule is also included in the SESC Permit Application Packet.
Montmorency County SESC Ordinance The current County ordinance establishing the requirements and procedures for administration and enforcement of the Soil Erosion and Sedimentation Control program.
EGLE Final Approval Letter Final approval of the Montmorency County SESC Ordinance by the Michigan Department of Environment, Great Lakes, and Energy (EGLE).
Current SESC Fee Schedule The current permit, plan review, renewal, utility, mining, and violation fees established for administration of the County’s SESC program.
Montmorency County’s Soil Erosion and Sedimentation Control program is administered locally under Part 91. Additional state requirements may apply depending on the size, location, and type of project.
EGLE Soil Erosion & Construction Stormwater The Michigan Department of Environment, Great Lakes, and Energy (EGLE) provides statewide information regarding Soil Erosion and Sedimentation Control, construction stormwater, permitting requirements, and technical guidance.
Part 91 Guidance & Technical Resources EGLE maintains additional Part 91 resources including guidance documents, frequently asked questions, inspection information, permit transfer forms, technical resources, and Best Management Practice (BMP) guidance.
Larger Construction Projects Projects disturbing larger areas of land may have additional state construction stormwater requirements in addition to the Montmorency County SESC permit. Projects disturbing 1 to less than 5 acres may be subject to additional Permit-by-Rule and construction stormwater requirements.
Applicants planning larger projects are encouraged to review EGLE requirements and contact the Soil Erosion Officer early in the planning process.
Shoreline, Wetland & Water-Related Projects A Montmorency County SESC permit does not replace other federal, state, or local permits that may be required. Projects involving shoreline work, seawalls, riprap, wetlands, inland lakes or streams, floodplains, or other regulated water resources may also require approval from EGLE or another permitting agency.
Preparing Your Site Plan A complete site plan is required before a SESC permit application can be approved. The Montmorency County application packet includes:
Site plan requirements
A completed sample site plan
A blank site plan worksheet
Project timing information
Applicants may also review EGLE’s Part 91 SESC Plan Minimum Requirements Checklist for additional guidance.
Questions About Your Project? If you are unsure whether a SESC permit is required, what information needs to be submitted, or whether your project may involve additional requirements, please contact:
Joseph Stone Montmorency County Soil Erosion Officer Phone: (989) 785-8006